I stopped by the "new" WWAM hangar tonight to check out the progress. The dividing wall between the two hangars is now gone, with the exception of the extreme rear wall between the two bathrooms. This gives us a 50 x 110 ft hangar, which will house 4 of the 5 WWAM planes at least.
Construction continues to install a sink / cabinet in the "men's bathroom" and some plastic removable railings with plastic chains to "alert" folks in the hangar of the 6 in step down between the two hangars.
The T-34 is in the hangar, and the T-28 should be able to join it this weekend.
Friday pm I am making a fuel run to Brown Field after work, then on Saturday / Sunday we are flying the T-34, T-28, and L-29.
No comments:
Post a Comment